BYRD Gully Drainage Improvements Community

Estimated Cost $711,800.00

This project is channel and crossing improvements on the upstream end of Byrd Gully. The channel has 6 crossings that are inadequate to carry the flows without some level of flooding occurring. This project will begin with the first crossing upstream of Reins Rd. In addition to the crossings being enlarged, the channel side slopes will be laid back from a 2:1 slope to design grade and bedded on 6 inches of cement stabilized sand.

 

Click Or Tap The Image To Enlarge

DD6 Reports

Get In Touch

  •  6550 Walden Road
    Beaumont, Texas 77720-0078
  •  409-842-1818
  •  409-842-2729
  •  support@dd6.org