Rehabilitation

The project will provide for the installation of a new concrete liner along Ditch 107 between Sarah St and Cardinal Drive (US69) in the City of Beaumont, and will also provide for cleaning of existing drainage boxes/culverts north of Sarah Street, west of Fannett Rd along 11th Street, and under Cardinal Drive. 

The Ditch 110-B Project is a drainage project that will repair a damaged section of the ditch by replacing the failed concrete walls and bottom with a pre-cast concrete box culvert. 

DD6 Reports

Get In Touch

  •  6550 Walden Road
    Beaumont, Texas 77720-0078
  •  409-842-1818
  •  409-842-2729
  •  support@dd6.org