Ditch No. 107 Rehabilitation

Estimated Cost $ 1,079,066.00
 
The project will provide for the installation of a new concrete liner along Ditch 107 between Sarah St and Cardinal Drive (US69) in the City of Beaumont, and will also provide for cleaning of existing drainage boxes/culverts north of Sarah Street, west of Fannett Rd along 11th Street, and under Cardinal Drive. Remove silt and debris out of the existing 7'x 7' box and 60" diameter culverts at the upstream end of Ditch 107 to a point approximately 100 ft east of Sarah Street. Remove silt and debris out of the existing 60" diameter storm sewer pipes along 11th Street, to a point approximately 350 ft. north of Fannett Road. Remove silt and debris out of the existing 10' x 8' box culverts under Cardinal Drive (US69). Restore the project area to original or better condition. The section of ditch to be enlarged and concrete lined is approximately 1,250 feet long.

 

Click Or Tap The Image To Enlarge

Get In Touch

  •  6550 Walden Road
    Beaumont, Texas 77720-0078
  •  409-842-1818
  •  409-842-2729
  •  support@dd6.org