Ditch No. 110-B Rehabilitation

Estimated Cost $ 799,495.00

The Ditch 110-B Project is a drainage project that will repair a damaged section of the ditch by replacing the failed concrete walls and bottom with a pre-cast concrete box culvert. This culvert will be larger and will convey more floodwaters than the existing ditch. Additionally, the downstream end of the ditch will be reconstructed to provide a better transition into the receiving stream. Fencing will have to be removed and replaced to accomplish the project. Approximately 500 feet of the ditch will be repaired and improved with this project. 

 